Case Studies
BIPV · Large roof
10.84 MW BIPV, Jianhu Yueyang Phase II
26,236 modules of 380 / 435 / 445 Wp across the Yueyang Phase II roofs — 10.84 MW, about 11,924,000 kWh a year and 11,888 t of CO2 avoided annually.
Jianhu, Yancheng, Jiangsu, ChinaIndustrial
10.84 MW
Installed capacity
11.92 GWh
Expected annual generation
11,888 t
CO₂ displaced per year
Our largest building-integrated PV installation: 10.84 MW across the roofs of the Jianhu Yueyang Phase II industrial development. The array uses 26,236 modules in three power classes — 380, 435 and 445 Wp — and generates about 11,924,000 kWh a year, avoiding around 11,888 t of CO2 annually.
At this scale a BIPV roof is a power station: the module layer is the roof covering of every building in the phase, generating over the industrial buildings beneath it. Three module classes were used to fit the different roof geometries across the development.
Delivered by our Jiangsu BIPV base in Jianhu, Yancheng, which also lists Yueyang Phase I among its BIPV projects.
Start a conversation
Bring zero-carbon mobile buildings to your project.
Talk to our Doha team about feasibility, customization, and lead times.