1.12 MW rooftop PV, Jianhu County Water Company
1,115.64 kW of rooftop PV for the county water company — about 1,227,000 kWh a year and 900 t of CO2 avoided annually.
Jianhu, Yancheng, Jiangsu, ChinaUtility
1.12 MW
Installed capacity
1.23 GWh
Expected annual generation
900 t
CO₂ displaced per year
A 1,115.64 kW rooftop PV system for the Jianhu County Water Company, generating about 1,227,000 kWh a year and avoiding around 900 t of CO2 annually.
Water treatment and pumping run around the clock, so a utility site has a steady base load that daytime PV offsets directly. The system is building-applied (BAPV), mounted on the company's existing roofs. It is one of several utility installations in our Jiangsu project list, which also includes the Shanggang water company, the Chengnan, Chengbei, Shanggang and Jiulongkou wastewater treatment plants and a series of power-supply stations and substations.
Delivered by our Jiangsu base in Jianhu, Yancheng.
Start a conversation
Bring zero-carbon mobile buildings to your project.
Talk to our Doha team about feasibility, customization, and lead times.